Most of us, at some point in our lives think of
purchasing a building lot or acreage in the
country and building a dream home. For most
of us it will be the largest single investment of
a lifetime. The first step, prior to constructing
the foundation should be a geotechnical report
of the building site. The cost of the
geotechnical soil borings report will be only a
fraction of the total construction cost and could
be the best investment for your project,
knowing your investment is on solid ground.
|
| |
 |
| |
| SURVEYED PILE INSTALLATION |
| |
| If piles are required, the geotechnical report
will indicate the depth the piles need to be driven
to provide solid bearing support. The engineer can also design the correct piles for the
structure. |
| |
 |
| |
| PILE LAYOUT |
|
|
 |
| |
| PILE EXTENSIONS |
| |
| f the required torque reading is not reached
at the specified depth, extensions can be
added to the pile enabling the installer to
drive the pile to a depth with solid bearing soil. |
| |
 |
| |
| PILES READY TO BE CUT TO ELEVATION |
| |
 |
| |
| CAPPED PILE, TIED IN, READY FOR CEMENT |
|
|
 |
| |
| Properly installed HPS foundation products
offer strength support and a cost effective
solution. HPS understands the requirements
of the customer to solidly design and install
foundations correctly, the first time. |
| |
 |
| |
 |
| |
| |
| |
|
|